CIVIL ENGINEERING REFERENCES
• Modernization of local roads in the length of 1 km Danilovgrad
• Reconstruction of Njegoševa Street - Cetinje (Street is under the protection of monuments and It`s the oldest street in Montenegro)
• Construction of the street with parking lot in the Dup 1st May in Podgorica
• Construction of Konik street, Stari aerodrom Podgorica
• Construction of the Spoman Park Road, Kruševac, Podgorica
• Construction of the street DUP "Ibričevina", Podgorica
• Street Slobode in Podgorica,
• Reconstruction of the street in Daošina,Dobrota
• Rehabilitation of the local road network, Danilovgrad
• Modernization of local roads in Niksic Municipality
• Modernization of local roads in the Municipality of Plužine
• Protecting the right coast side of the river Tara and the local road towards Prošćenje the II phase Mojkovac Municipality
• Reconstruction of urban roads in the Municipality of Rožaje
• Modernization of local roads Municipality of Rožaje
• Modernization of local roads Municipality Andrijevica
• Construction of a sidewalk in the St. Peter Cetinjski Boulevard, Podgorica
• Construction of auxiliary football pitch in Berane
• Construction of auxiliary football pitch in the Municipality of Kolašin
• Construction of tennis courts Eminent
• Square Repubilke in Podgorica (soil and installation works)
• Rehabilitation of the Lješko-poljski Channel Podgorica,
• Preliminary works for setting up containers for accommodating displaced persons Konik
• Performing works on the reconstruction of the road Ski resort "Kolašin 1450" Jezerine Ski Resort "Kolašin 1600" in Kolašin Municipality - earth works from PR 45 - PR 143
• Execution of works on the construction of MR1 (I phase)
• Execution of the works of the second phase of the reconstruction of the road Rožaje - Štedin, in the municipality of Rožaje
• Performing works on the reconstruction of the Ski resort "Kolašin 1600" Jezerine to Ski resort "kolašin 1600"
• Works on cable installation Italy - Montenegro, Jaz - Lastva Grbaljska, Kotor
• Remediation of Vrtijeljka Cetinje landfill
• Works on the construction of the Vragodo-Vrioci road Žarski katun, Phase II, Municipality Mojkovac
• Works on the reconstruction of Nemanjica Street Mojkovac, Phase I
• Performing works on the reconstruction of Nemanjic Street Mojkovac, Phase II
BUILDING CONSTRUCTION
• Construction of buildings Bečići gross 1,700 m2
• Reconstruction of Nikšić-Ostrog railway station 120 days
• Construction of residential and business building Podgorica 2150m2
• Construction and craft works at the military building Taraš Danilovgrad, 3 months
• Construction of residential and business building S (G) + P + VII, area 4.355,15 m2 with 45 residential units in the Municipality of Budva
• Construction of a restaurant and complex facility at Ski Center Bjelasica, floors Su + P + 1, total gross area of 1.152,60 m2, Kolašin municipality
HYDROTECHNICAL WORKS
• Performing works on the water supply of the villages Gornje Zete ,Mitrovici, Ljajkovići, Botun, Cijevna in Podgorica in the length of 7,5 km
• Works on the water supply in the settlement of Luznica in a length of 3.7 km
• Performing works in the water supply system Donje Zete pipeline Balijača, Podgorica. At a length of 5.6 km.
• Construction of waterworks, footpaths and lighting in Bistrica, Podgorica
• Execution of works on the construction of sewerage in Bohinjska street in Podgorica
• Construction of a sewerage system of Husinje miners
• Construction of hydro-engineering installations in the DUP Gorica C (faecal and atmospheric)
• Construction of water and sewerage network in Gretva, Municipality Bar
• Exchanging the sewerage, street 19th December, Investor Zetagradnja
• Construction of faecal sewerage and water supply for the purpose of equipping the location of the memorial park Kruševac
• Construction of a sewage system in Street 2003 Block VI Podgorica
• Construction of sewerage and connection of residential and business building Block 35-36
• Modernization of local roads Municipality Andrijevica
• Performing works in the water supply system for the settlement Beglake I Goricani, Podgorica in the length of 7.7 km
• Execution of works in the water supply for the village of Gosici Podgorica in the length of 5 km
• Performing works in the water supply system for the settlement Gostilj Podgorica in the length of 4.8 km
• Reconstruction of the city road - the local road Plav-Vojno selo
• Reconstruction of Palih partizanki street in Kolasin
• Regulation of the river Tara III phase Kolašin
• Regulation of the river Tara III phase Kolašin
• Execution of works in the water supply system Donje Zete, Balajce pipeline
• Performing works on the water supply Gornje Zete ,Mitrovici, Ljakovići, Botun, Cijevna
• Works on the Donja Zeta water supply to the village of Matagazi I and II part of Podgorica in the length of 15,5 km
• Works on the Donja Zeta water pipeline through Vukovci in the length of 5.6 km
• Works on the reconstruction of the water supply network GO Tuzi Karabusko polje in the length of 7,9 km
• Extension of the water supply network Tuzi- Kuća Rakica-Sukuruc Podgorica in the length of 13,2 km
• Construction of a water supply network in the southern settlement of Tuzi (Part II) Podgorica in the length of 7.4 km
• Construction of water supply and sewage network Zlatica (9 streets), Pg, 7km
• Construction of water supply and sewage network Zlatica (9 streets), Pg, 7km
• Reconstruction of the Boulevard of Josip Broz Tito bb I Proleterska
• Construction of 3 camps for the Bar-Boljare highway
• Reconstruction of Mojkovacka Street in Bijelo Polje
• Construction of part of the road "Streets 4" and the construction of Dup "Zabjelo 9" in Podgorica
• Regulation of the Grncar River and construction of a pedestrian bridge, Municipality of Gusinje